Does your floor need leveling? Call CRI
!
We'll install a self leveling cement to
your wavy or uneven floor.
All floors designated to receive self
leveling cement will be prepared to establish an adhesion profile. The
material will be mixed in a twin hopper batch mixer, and pumped to the
floor. Once applied, the self leveling cement is pulled smooth and
allowed to dry.
Pre-fill may be required prior to the
placement of self leveling cement. The finished product may be coated,
tiled, or carpeted.